LBU was responsible for managing the implementation and long-term operations of Phase 1 of the Pan Borneo Highway Sabah, a complex infrastructure project spanning over 700 kilometers. Coordinating design, construction, quality assurance, safety, and asset information across multiple stakeholders required a connected and scalable digital approach.
The organization needed a centralized platform to integrate project information, support BIM adoption, improve collaboration, and provide real-time visibility into project performance while meeting strict delivery timelines and preparing for long-term operations and maintenance.
Digile implemented an integrated digital project and asset management solution built on Bentley technologies. The platform connected design, construction, operations, and asset information through a Common Data Environment, enabling seamless collaboration and informed decision-making throughout the project lifecycle.
The solution also introduced BIM-enabled workflows, customized operational dashboards, and asset lifecycle management capabilities, providing LBU with a digital foundation for efficient highway operations and maintenance.
The solution included:
The digital platform transformed how LBU managed highway operations by connecting project information, asset data, and operational insights into a single intelligent ecosystem. This enabled faster decision-making, improved collaboration, and more efficient management of highway assets throughout their lifecycle.
- Streamlined design and construction workflows
- Improved collaboration across project teams
- Enhanced asset lifecycle management
- Real-time monitoring of project performance
- Strengthened quality, safety, and risk management
- Increased operational visibility through live dashboards
- Supported timely delivery of the Pan Borneo Highway project
- Established a scalable digital foundation for long-term operations
By combining BIM, digital engineering, and connected asset management, Digile helped Lebuhraya Borneo Utara build a future-ready highway management ecosystem that continues to optimize operations, maintenance, and asset performance across one of Malaysia’s most significant infrastructure projects.